Because generated electricity was not fully evacuated onto the national grid between 2015 and 2021, power generation companies lost at least N1.632 trillion. The Association of Power Generation Companies' statistics shows that out of a total generation capacity of 7793MW, 1 billion loss over 3742MW of power was left stranded. Due to the 3699MW of stranded power, N264 billion was lost; the power producing companies then lost N256 billion. Regarding the frail transmission and distribution network, it has been found that infrastructure affects reliability, and correct metering ensures accurate invoicing. However, the problem's primary symptom can be resolved. Power specialists are thrilled about this because they think it would help to tackle the problems facing the industry. Gencos reportedly handed to the royal family for the first time in Nigerian history.